Louisiana Department of Transportation and Development (LA DOTD) contracted Primoris for their LA 1 Improvement project. The project included, 5.3 miles total, 435 concrete beams, 232,661 Lf of 23” concrete piles, 28,834 Lf of voided slabs, 96,760 LF of Type III concrete girders, 7 million lbs of refining steel, 30,274 OF of ready-mix concrete.

Primoris  received several awards on this project:

HCSS’s 2014 Most Interesting Project
AGC’s 2013 Alliant Build American Award
ABC’s 2012 Award of Excellence
Roads & Bridges’ 2012 Top 10 Bridges (#6)
ENR’s 2012 Award of Merit