Skip to main content
.

Bradley West International Terminal Expansion Project

.

Bradley West International Terminal Expansion Project

Location: Los Angeles International Airport (LAX)

Primoris  abandoned and removed existing fuel and oil lines; installed a 34.5kV duct bank, and a communications duct bank; installed new firewater and water and new natural gas and reclaimed hot and chilled water distribution systems; installed new storm drain and sewer lines; performed two large bore and jacking operations for new utility connections crossing under the existing Bradley International Concourse building; demolition of the existing Taxiway Q.


Gallery Images