El Centro Unit 3 Re-powering

.

El Centro Unit 3 Re-powering Project, EPC

Location: California

Teamed with Worley Parsons providing Engineering, Procurement, and Commissioning Services, we constructed for Imperial Irrigation District a 144 MW Combined Cycle - The Unit 3 Re-power will replace the existing 44 MW conventional boiler with 2 each Siemens SGT 800 Gas Turbines & 1 each Siemens SST 600 Steam Turbine. Primoris has an EPC contract for the Design and Construction of the project.

The scope of the work on the El Centro Unit 3 Re-powering project involved – Engineering, Fabrication, Civil/Foundations, Cooling Tower Erection, CTG & STG Erection, HRSG’s (2), I&E, Structural Steel, Piping, Balance of Plant Equipment (BOP) Commissioning & Performance Testing.