Riverside Energy Resource Center - Units 3&4, 96 MW Addition

Location: Riverside, California

Primoris  was the turnkey contractor for City of Riverside, Unit 3 & 4 96 MW addition in Riverside, CA. The scope included the installation of two GE LM6000 Sprint NxGen gas turbine generators. Installed equipment included:

  • Two CTG/SCR packages
  • Two Delta Star transformers
  • Three natural gas compressors
  • Six Siemens 69kV 2000 A breakers
  • PDC
  • Field fabricated and erected tanks
  • Shop fabricated tanks
  • 480 V MCC
  • Compressed air system
  • DCS
  • Oily water separator
  • ZLD water treatment system

Primoris  was responsible for all civil, structural, mechanical, piping, electrical and instrumentation construction, unloading, setting and installing all equipment.