Skip to main content
.

Wastewater Reclamation Facility

.

Wastewater Reclamation Facility

Location: City of Miramar Florida

City of Miramar Florida contracted Primoris to construct their Wastewater Reclamation Facility, Design/Build expansion project of the WWRF to a permitted capacity of 10.5 MGD on an AADF. Work included: (1) new aeration basin, modifications to the existing (4) aeration basins, modifications to the existing blower building, (1) new clarifier, modifications to the existing sludge pumping station, (1) new injection well pump & replacement of the existing plant PLC network.


Gallery Images